Skip to content
Al-Masrya Constructions and Road Paving
High-Speed Electric Train — Bahig Sector (2 km)

Infrastructure Works

High-Speed Electric Train — Bahig Sector (2 km)

Clearance, earthworks and embankment for a 2 km sector of the high-speed electric train at Bahig.

Project overview

Al-Masrya delivered a 2 km sector of the high-speed electric train corridor through Bahig.

Working right beside homes and the operating railway, the crews cleared the right-of-way, removed debris with excavators and trucks, then graded and compacted the embankment layers along the alignment.

Project gallery

Related projects