

Infrastructure Works
High-Speed Train — Gharbaniyat Sector (3 km)
Earthworks and embankment layers for a 3 km sector of the high-speed train at Al-Gharbaniyat, Borg El Arab.
Project overview
Al-Masrya executed a 3 km sector of the high-speed train corridor at Al-Gharbaniyat, Borg El Arab.
The works covered excavation, building up and compacting the embankment layers with graders, rollers and water tankers, and placing the geotextile separation layer alongside the existing railway line.

